|
DAVID's new outdoor kitchen under construction. Will be done in plenty of time for the 12th Annual Dairyville PEZ Gathering |
|
closer image |
|
David in front of the space where One of the BBQ's will be inserted |
|
David standing facing the people sitting at the bar |
|
open space for ???? don't know yet |
|
space next to one of the bbq's which will be shelves |
|
this hole is where the refrigerator will be inserted |
|
dang.. missed the slot where the sink goes. it is just to the right of the first opening |
|
the newest bbq added to David's fleet of 4 bbq's. There will only be 2 in his new kitchen tho. this one and the Jenn Air |
|
Another stage completed. The granite counter top is on and the bbq is inserted |
|
bbq #1 |
|
granite |
|
refer hole and sink hole |
|
:) Sink hole top. Plumbed but not inserted yet |
|
shelves going here |
|
referigerator going here |
|
space for waste can next to bbq |
|
space for extra propane tanks here |
|
long shot |
|
bar side on left |
|
bar side closer |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|